Description: This project scope of work involves three buildings. One 7200 SF Pre-engineered metal building, with five open bays for equipment storage, two shop area bays and an enclosed office, bathroom and conference area. The second building is a 2,000 SF onsite residence constructed of block and brick, the residence will house four research associates. The third building is a 900 SF concrete block head house that will be used to support research activities in a newly constructed greenhouse. This project was fast tracked in that we ordered the metal building prior to the complete bid documents being completed. This process saved 4 weeks in overall construction time.
Correlation: UF-IFAS Minor Project, CM project, Typical size and location of possible UF Minor Projects. This project highlights our ability to manage projects will multiple buildings in a remote location. Five proposed team members worked on this project. Brent Taylor - Project Manager, Ralph King - Project Superintendent, Nancy Taylor - Project Coordinator, Kevin Odom - Labor, Brian Melton - Labor.
|