|
|
Before construction
|
|
|
Getting rid of the clay under the building.
|
|
|
New foundation at tie-in point. Note: AC unit on left to be relocated.
|
|
|
Founhdation walls coming out of the ground
|
|
|
Pouring the main slab
|
|
|
First of many lifts of masonry
|
|
|
Getting up to second floor level
|
|
|
Bearing walls capped out
|
|
|
Setting the trusses
|
|
|
Decking the roof
|
|
|
Brick getting started
|
|
|
Second floor framing underway
|
|
|
Pouring the second floor slab
|
|
|
Brick near completion
|
|
|
Interior framing and rough-in under way
|
|
|
Second floor ready for framing and rough in.
|